Class Room_Lead 360

Lead-360-2-1-1
08
Feb
₹20,500.00

Fiber Optic Technician Program

Description:

This unit is concerned with the installation,splicing,termination and testing of fiber optic cables,typically a multi-element, singlemode fiber cable of atleast 24 fibers, used in an external environment.

Duration:

4 days(20 learning hours)Self-paced,Live Webinar, Q&A, Assessment

  • Fibre optics in communication networks
  • Fibre specifications and parameters
  • Test and inspection methods
  • Components and equipment
  • Best practices and fibre management
  • Testing methods
  • Cable laying procedures
  • Identifying Cables
  • Constructional features of singlemode fibre
  • Cable cuttng and stripping tools
  • Fibre cleaning materials and techniques
  • Preparing cable for splicing
  • Cable joining environment
  • Working principles of splicing
  • Preparing bare fibre
  • Splicing fibres
  • Sealing and cable retention for joint enclosure
  • Suitable connectors for telecoms environment
  • Cable termination
  • Cleaving, tools and techniques
  • Splice management and protection systems
  • Test methods
  • Testing equipment i.e ILM, OTDR
  • Understanding results
  • Documenting and comparing results

Exam & Assessment Method:

    Eklavvya Multiple Choice Assessment
  • Test methods
  • Testing equipment i.e ILM, OTDR
  • Understanding results
  • Documenting and comparing results

Trenching & Ducting

Description:

The first step to lying optical fibre is to dig a straight trench, either horizontal or vertical and generally deeper than its width,with a high-tech HDD machine. Where HDD machines cannot be deployed due to their hugh size for site conditions, such as in sloppy terrains,we use splicers. A certain number of manholes and handholes are created as well ,maintaing the desired ratio, to join the optical fibres to the links and for monitoring purpose later.

Duration:

3 Days (15 learning hours Self-paced+Live webiner+ Q&A + Assessment)

Basics of Excavator:

  • Classification & Application
  • Component Location
  • Operation Principal
  • Self-generation
  • Buckets
  • Rock Breaker
  • Ripper
  • Work Breakdown Structure(WBS)
  • GANNT Chart
  • PERT/CPM Analysis
  • job sequencing rules
    • Concept of safety & symbols
    • Classification of fires
    • Fire Extinguishers & their application
  • Eklavvya Multiple Choice Assessment

        • Instructor Led with Hands-on labs & Excerices
        • Online 1 hour duration
        • Assessed practical exercises

    Fiber To the Home-FTTx

    Installation,Testing And Troubleshooting(Active and Passive)

    Description:

    This Hands-On 2-day course(3 Days if the prerequisites are not met) is designed to benefit those requiring an introduction to the principles and applications of passive and active Optical Networking and Fiber Systems including Fiber to the X(FTTx)application,as their associated equipment and testing requirements and methods using an effective mix of classroom and Hands-On to help participants Lockdown a complete understanding of the equipment,testing and tasks to be undertaken in real-life situations.

    Duration:

    3 days(15 learning hours)Self-paced,Live Webiner, Q&A, Assessment

    Fiber OPTIC Refresher

        • Fiber Optic Theory & Waveguide Functions
        • Singlemode & Multimode Fiber Types.
        • The Causes of Attenuation
        • Optical Dispersion
        • The Three Basic Elements of Fiber Optic Systems & Discuss their Uses.
        • Loose Tube & Unitube Cables
        • Distribution & Feeder Cables
        • Fiber Color Code
        • Fusion Splicer Applications & Fiber Alignment Systems
        • Mechanical Splicing Uses & Application
        • Optical Connector Styles & Application
        • Back Reflection Issues & Angled Physical Contact Connectors
        • Patch Panels & Functions For Distribution &Transmission
        • Entrance Facility Design & Specifications
        • OSP/Pons Styles Splice Closure Styles & Function
        • Cable Installation Method as Direct Bury,Aerial & Ducted
        • Safety Practies (General & Fiber Optic Specific)
        • Cable Installation Method as Direct Bury,Aerial & Ducted
        • Using a Power Meter & Light Source Test Loss Budget of The System
        • xPON Network Design Features
        • Standards and Work Groups as FSAN,ITU & EEE
        • xPON Architecture as APON,EPON,BPON,GPON,FTTH/FTTx/PON
        • Optical Return Loss(ORL)
        • Link Budget, Reach & Split Ratio
        • Topologies for Urban & Rural Communities
        • PON System End Equipment Splitters,ONU/OLTS,ODNS
        • xPON Transmitters & Receivers
        • Recognizing/analyzing software bugs down to instruction level
        • Network Element Database administration
        • Subscriber Database Administration
        • Traffic Administration
        • Billing Administration
        • System Feature Administration
        • Report Generation
        • Crash Recovery
        • Site & Fiber Safety
        • Closure types used in FTTx Applications
        • Proper OSP Cable Installation
        • Proper Closure Preparation
        • Fiber Prep for splicing
        • Splicing Single Pigtails
        • Splicing Fiber Drop
        • Testing Methods for PONs Networks
        • Expected Loss Vs Actual Loss
        • PON OTDR Tesing Through Splitters
        • PON Optical Loss Testing(Light Source,PON Power Meter)
        • Calculating a Loss & Power Budget

    Eklavvya Multiple Choice Assessment

        • Instructor Led with Hands-on labs & Excerices
        • Online 1 hour duration
        • Assessed practical exercises

    Aerial Fiber Cable Placing Methods

    Description:

    This Hands-On 2-day course(3 Days if the prerequisites are not met) is designed to benefit those requiring an introduction to the principles and applications of passive and active Optical Networking and Fiber Systems including Fiber to the X(FTTx)application,as their associated equipment and testing requirements and methods using an effective mix of classroom and Hands-On to help participants Lockdown a complete understanding of the equipment,testing and tasks to be undertaken in real-life situations.

    Duration:

    2 days(10 learning hours)Self-paced,Live Webiner, Q&A, Assessment

    Precautions:

    • Cable Handling
    • LED and Laser Precaution
    • Optical Fiber Handling Precautions
    • Material Safety
    • Safety During Installation
    • Presonal Protective Equipment
    • Traffic Safety
    • Placing Euipment
    • Cable Protection and Reel Handling
    • Messenger Strands
    • Moving Reel Method
    • Stationary Reel Method
    • Cable Lashing
    • Figure-Eight Cable
    • Dead-Ends
    • All-Dielectric Self-Supporting(ADSS) cable
    • Micro-Ducts
    • Micro-Ducts Cables
    • Jetting:Micro-Duct Cable Placing Method
    • icro-Ducts Jetting
    • Pre-Construction Survey
    • Pre-Construction Fiber Measurements

    Eklavvya Multiple Choice Assessment

    • Instructor Led with Hands-on labs & Excerices
    • Online 1 hour duration
    • Assessed practical exercises

    Course Content

    Time: 10 weeks

    Curriculum is empty

    0.0

    0 rating

    5 stars
    0%
    4 stars
    0%
    3 stars
    0%
    2 stars
    0%
    1 star
    0%
    ₹20,500.00